2016 FEE SCHEDULE

Landfill 

  • All trucks; semis, tandems and bins: $53 per ton (minimum charge $265.00)
  • All flatbeds/trailers: $53 per ton (minimum charge $212.00)
  • Pickup trucks/ vans less than 2 tons: $76.00 per load

Landfill with LEED tracking (Leadership in Energy and Environmental Design) 

  • All trucks; semis, tandems & bins: $57 per ton (minimum charge $285)
  • All flatbeds/trailers: $57 per ton (minimum charge $228)

Asbestos $95 per ton plus $95 per load handling fee  (minimum charge $190) 

Special Waste Disposal $97 per ton plus $97 per load handling ($194 min) 

Select Concrete Pricing: 

  • Clean concrete loads (Not mixed waste): $53 per ton
    • Lead painted concrete must be separate from clean concrete
  • Concrete with Lead Base Painted Surfaces: $53 per ton
    • TCLP required for all residential and commercial demolition and all commercial renovation projects that contain lead base paint.

Mixed loads of concrete $53 per ton (minimum charge $265)

Screened Dirt & Co-Plane No Charge: Call Office for Approval

Carpets $98 per ton (minimum charge $294)

Additional Handling Fee for Unacceptable Materials: 

  • Lead-acid batteries $40 per battery
  • Tires up to regular size auto $40 per tire
  • Mattresses $50 per mattress
  • Tires up to bus size tires $80 per tire

Additional Service Fees: 

  • Assistance to empty wedged or trapped debris $150.00 minimum
  • Assistance to reload unacceptable material $98.00 minimum
  • Hydraulic fluid spills on landfill $196.00 minimum
  • Onsite Inspection fee (effective 8/17/15) $100 minimum

TREE STUMPS ONLY UPON APPROVAL

Call for Information 

ADD GENERAL EXCISE TAX (GET 4.712%) TO ABOVE FEE SCHEDULE

2017 Fee Schedule PDF (Effective 07/01/2017)